Fortum Head Office

Fortum moved to a new address in Keilaniemi, Espoo. The building was refurbished in half a year. In the final stages, Audico Systems installed AV systems in the energy company's magnificent showroom and dozens of meeting rooms.

From the outside, the house is all glass and steel. Its wing facing the Westerwelle has been rebuilt for Fortum. This is Nokia's former main building from its glory days.

The atmosphere becomes electric and my vision sharpens as I move from the bright lobby into the dim oval space. The brand new arched room is called the Showroom.

"In this room, we tell the story of the company. Using videos and new technological tools, we'll demonstrate different forms of energy production and show somefeed on LED screens. The constant feed tells you where we are in everything and what people are talking about us around the world," says Fortum's brand manager Tarja Hänninen.

The interior of the showroom is eye-catching with all its technology. Hänninen shows how the colour of the ceiling can change from one mood to another in an instant. The company's production data runs along the walls. The main display - 12 square metres in size - shows megatrends in the energy sector and provides information on topics such as digitalisation, urbanisation and climate change.

Next to the waterfall wall, I snap on my virtual glasses and immerse myself in stunning 360° videos. I'll be in a solar power plant in India, a wind farm in Norway and a hydroelectric power plant in Sweden. An interactive PufferSphere sphere comes to life when I touch it. The colourful map globe shows you where on Earth electricity is used and how ocean currents and winds travel.

"Visitors to the house can take a tour of the room on their own or we can arrange a guided tour. We hold a wide range of events in the Showroom. People are impressed because the technology here is spectacular and the sounds are loud and come from different directions. When our in-house staff or our guests give a presentation here, they can easily connect their own equipment to the room's sound and image systems," says Tarja Hänninen.

Fortum's service manager Kari Juhani Innanen says the teamwork between the three companies worked seamlessly in the large-scale AV operation. Granlund Oy designed the AV upgrade and then put the contract out to tender. Audico Systems then supplied and installed most of the equipment in Keilaniemi.

The new technology - including large screens, LED walls, touch screens, wireless imaging systems, speakers and microphones - was needed not only for the showroom but also for more than 50 meeting rooms, boardrooms, the CEO's boardroom, auditorium, co-creation space and many other locations.

"Audico had a clear vision of the technology that could meet our requirements and they knew the latest trends in the industry. Audico was proactive and eager to offer alternatives when needed. We ended up giving the responsible operator a bigger slice of the supply than we had originally intended," says Innanen.

"A good AV supplier does what is agreed, sticks to the schedule and sticks to the budget. Audico did exactly that, so we chose the right partner," concludes Kari Juhani Innanen.

"The world is going wireless. For example, wireless chargers are already commonplace in neukaries and workstations. We are looking forward to the next evolution of wireless imaging. Then the image will be transferred from the laptop to the big screen conveniently and there will no longer be a need for many different standard connection cables."

The completion of the headquarters was on a tight schedule: the whole project was completed in just over six months. At the same time, Fortum has also implemented a major change in corporate culture and learned new ways of working. For the people in the building, the move meant moving into about a third of the former square footage, and at the same time giving up personal workstations.

Marko Hyvärinen, project manager at Audico, says that the Fortum job was a good demonstration of how they can get the job done in style, even under pressure and pressure.

"The whole chain from equipment delivery to transport and final installation went off without a hitch. On construction sites, there is almost always a rush at the end because everything piles up at the tail end. We only get down to business when the last pieces of furniture are in place. But we are used to it and know how to work accordingly," says Hyvärinen.

PHOTOS: Kuvio Oy, Fortum Oyj and Audico Systems.

TEXT BY Tom Nyman

Fortum
Looking for something similar?
Contact us
Toni Hämäläinen
Project Sales Manager
+358 20 747 9387
toni.hamalainen@audico.fi

REFERENCES

Here's some of our work. By clicking the buttons, you'll find our references sorted for different industries.
Show All
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Coop Norrbotten Arena

Coop Norrbotten Arena

Audico (time. Bright Installation AB) carried out an extensive installation in Coop Norrbotten Arena with the aim of creating a live experience beyond the ordinary.
Read More
ITM Finland

ITM Finland

ITM Finland is responsible for traffic control and management on Finnish motorways. This requires reliable technology. The data collected benefits motorists, authorities and traffic planners. Future intelligent traffic and automated driving will increase the need for data.
Read More
Helsinki Outlet

Helsinki Outlet

Helsinki Outlet is the first outlet shopping village of its kind in the Helsinki metropolitan area. Audico was responsible for the sound system in the Helsinki Outlet's public areas, the outdoor space, and for the technical implementation of the Moment Magnet light artwork.
Read More
Veho

Veho

Veho gathered its office workers from different addresses under one roof in Aviapolis, Vantaa. The shape of the building and the Mercedes logo inspired the interior design of the headquarters. At the same time, the AV systems in the office were upgraded. Remote meetings now start smoothly and wirelessly.
Read More
Helsinki Olympic Stadium

Helsinki Olympic Stadium

The renovated Olympic Stadium combines timeless architecture, a unique history and a great future. Audico Systems implemented the video, audio and AV technology for the Olympic Stadium.
Read More
Finrail

Finrail

Finrail Oy is responsible for the management of railway traffic and the smooth running of trains. Traffic is controlled with modern equipment from control centres located throughout Finland.
Read More
Wasa Theatre

Wasa Theatre

The 100-year-old Wasa Teater, which is coming out of renovation, is the first in the Nordic countries to acquire the state-of-the-art L-Acoustics L-ISA sound system. Audico was responsible for the major overhaul of Wasa Teater's sound and lighting technology.
Read More
Helsinki City Council

Helsinki City Council

Audico did a precision job installing new panels on the councillors' desks in the Helsinki City Council chamber to run the meeting application system.
Read More
Audico Icon 3D
LET'S TALK.

Our team of professionals is eager to hear from you. Perhaps you have a question about your AV equipment? Do they need to be updated? Or is it a problem at the office in that one meeting room that everyone keeps avoiding? Or something else entirely? Drop us a message, and we’ll promise to help.
We are here for you.

Contact us