The 100-year-old Wasa Teater, which is coming out of renovation, is the first in the Nordic countries to acquire the state-of-the-art L-Acoustics L-ISA sound system. Audico was responsible for the major overhaul of Wasa Teater's sound and lighting technology.

Wasa Teater, one of Finland's oldest theatres, has been given a magnificent setting for its centenary celebrations - the complete renovation of the theatre was completed in time for the premiere of the musical Spelman på taket.

"We had been living in the middle of the renovation for a long time, so it's a real relief to finally just be able to enjoy the fruits of our labour," says Mats Antell, Wasa Teater's technical director.

The renovation of the theatre involved renovating everything from floor to walls and ceiling, from technology to the auditorium and air conditioning. At the same time, the lighting and sound systems were replaced, with Audico Systems Oy being chosen as the overall contractor.

According to Antell, the GrandMA-based lighting control system chosen by Wasa Teater can be called "the standard for Finnish theatres", so the choice was a safe one. Technical support is readily available, as is spare equipment, and visiting lighting designers are more likely to feel at home with GrandMA.

In addition to the MA Lighting GrandMA3 light table, Audico's supply package included a lighting control network and a large amount of fixed and mobile LED fixtures.

"We also provided a dual-function dimming system (dimmer/relay) that can be conveniently controlled by the lighting crew via QR codes on the power points, even from their smartphones," reveals Antell.

The entire sound system of the theatre was renovated, from speakers to amplifiers and from mixing desks to microphones. Vaasa is particularly proud of the state-of-the-art L-ISA Immersive Hyperreal Sound system from French company L-Acoustics, the likes of which have only been seen in metropolises such as Paris, London and Sydney.

"We are particularly pleased to be the first in Northern Europe to bring L-ISA to Wasa Theatre," Antell smiles.

L-ISA is able to offer a multi-dimensional listening experience, where, for example, the precision of the spatial experience exceeds anything that has gone before many times over.

"It is not without reason that 'immersive' audio has become the hottest topic in the industry, both on the theatre and concert fronts," summarises Audico's Sales Manager Pauli "Pave" Molnár, adding that L-ISA makes speech, vocals and instruments stand out much more clearly than the average theatre.

"The Vaasa musical would be challenging for anyone with familiar tools - let alone completely new ones, which we certainly didn't have too much time to get to know. I have to take my hat off to sound engineer Dennis Lindén, who has mastered everything so well and so quickly," says Molnár.

Wasa Teater's Lindén is excited about L-ISA, and with good reason. "L-ISA is a different tool from previous sound systems. I have a new drive, because the system makes possible ideas that have been running around in my head for a long time, and by its very existence it also generates new ones!"

Lindén considers his new tool, with all its versatility, to be very easy to use, and says that the upgrade has even speeded up the workflow.

"It's great that we were able to invest in a sound system like this now - and not in ten or twenty years' time, during the next renovation," Lindén says.

Audico implemented the Wasa Theatre's sound and light project from design to installation, commissioning to testing and programming to training.

"After winning the contract, we first visited the site in autumn 2018, when the demolition work was complete and the stage was effectively a black hole. We were able to start the installation work in spring 2019 and the renovation was originally supposed to be completed before the midsummer, but renovations of old buildings can be full of surprises," recalls Mikko Tenhunen, Project Sales Manager at Audico.

That's what happened this time. And even though the project was delayed as a result, the Audico team managed to finish the project before the autumn premiere, despite the summer holiday period.

Jonas Björkgren, who is responsible for the maintenance of the theatre building, praises Audico's performance after the renovation was severely delayed from the original schedule. Audico's theatre installations often had to wait for other phases to be completed. And there were changes needed right up to the chalk line.

"It was great how the Audico team patiently pushed with us to the finish line, and we were able to get everything done before the premiere," Björkgren says.

Audico's technician Pekka Patrikainen assembled the L-ISA system at the Espoo site, after which the equipment was moved to Vaasa. Patrikainen says the project has been challenging but also particularly interesting, as this was the first time the L-ISA system had been set up in Finland.

As a spectator of Wasa Teater's festive musical, Patrikainen describes the listening experience provided by the completed system as intense.

"The amplified sound is positioned in the performers, so that the gaze and the direction of the sound meet, and there is none of the conflict that sometimes arises with a conventional theatre sound system. With L-ISA, the theatre is able to create believable spatial effects, and to influence the characteristics of the space, for example by echoing and moving the sound in front of, behind and even above the audience," says Patrikainen.

Mats Antell sums up that Wasa Teater's starting point was to get the best possible sound system for the building. And the goal was achieved.

"The dialogue with Audico was excellent, and they have a competent, hard-working staff. All in all, Audico has been a good partner in this unique and challenging project," says Antell.

Wasa Teater, Vaasa's Swedish-language theatre company celebrating its centenary, is this season presenting the musical Spelman på taket (Fiddler on the Roof). Finnish subtitles are available.

The musical Spelman på taket.

Photo by Wasa Teater / Frank A. Unger

Jonas Björkgren (left) and Mats Antell

Photo: Trustmary

Wasa teater
Looking for something similar?
Contact us
Antti Murto
Project Sales Manager
+358 20 767 9413
antti.murto@audico.fi

Our Solutions

REFERENCES

Here's some of our work. By clicking the buttons, you'll find our references sorted for different industries.
Show All
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Metropolia University of Applied Sciences

Metropolia University of Applied Sciences

Metropolia is the largest university of applied sciences in Finland with more than 16 000 students. They all moved from 20 school buildings to four new campuses. This meant a huge amount of work. Audico was also been given a fair amount of space to showcase its work in Myllypuro new campus - currently 149, to be precise.
Read More
Restaurant Harju8

Restaurant Harju8

How important is music in the perception and experience of behaviour? This is something to ponder at Harju8 restaurant in Kallio, Helsinki, where a passion for music can be heard through the sound system.
Read More
Kupittaan Ball Sports Hall

Kupittaan Ball Sports Hall

"The Kupittaa Ball Sports Hall in Turku is an excellent example of modern, versatile and high-quality sports venue construction," the Ministry of Education and Culture said in its citation. It has been chosen as the Sport Venue of the Year earlier.
Read More
KappAhl

KappAhl

The use of digital solutions in stores is part of KappAhl's new and fresh store concept. Audico has supported KappAhl in designing the audiovisual implementation and has already delivered the systems to thirty stores in Sweden.
Read More
Parliament of Finland

Parliament of Finland

The House of Parliament shines and shines after a complete renovation. New technology has also been hidden in the restored halls.
Read More
Lahti University of Applied sciences

Lahti University of Applied sciences

Lahti University of Applied Sciences , LAB (aiemmin LAMK) has a new campus, with the construction of fireproof facilities for its five thousand students in the former Isku furniture factory in Mukkula.
Read More
Fortum Head Office

Fortum Head Office

Fortum moved to a new address in Keilaniemi, Espoo. The building was refurbished in half a year. In the final stages, Audico Systems installed AV systems in the energy company's magnificent showroom and dozens of meeting rooms.
Read More
Law firm White & Case

Law firm White & Case

When an international company decides to renew its entire movable property, including its AV equipment, both common, global decisions as well as local needs and special characteristics must be considered. Audico collaborated with law firm White & Case to find the audio-visual solutions for the firm’s new office, its design, renovation and implementation.
Read More
Audico Icon 3D
LET'S TALK.

Our team of professionals is eager to hear from you. Perhaps you have a question about your AV equipment? Do they need to be updated? Or is it a problem at the office in that one meeting room that everyone keeps avoiding? Or something else entirely? Drop us a message, and we’ll promise to help.
We are here for you.

Contact us